EXPLORE OUR

PROJECTS

EXPLORE SECTORS TO VIEW PROJECTS

Case Studies

AFFORDABLE HOUSING

Case Studies

PRIVATE RENTAL SECTOR

Case Studies

BESPOKE
& CARE

Case Studies

OPEN MARKET SALES

STAY IN THE KNOW

#keonhomes
EXPLORE OUR

PROJECTS

EXPLORE SECTORS TO VIEW PROJECTS

DEEDMORE ROAD, COVENTRY

Client: Citizen
Tenure: Full Affordable
Duration: 12 months
Location: Deedmore Road, Coventry
Status: Planning Approved
This development benefits from a planning approval for the construction of 21 fully affordable dwellings consisting of a mix of 2, 3 and 4 bed units. The site utilises otherwise redundant land and will provide high quality homes which will not only complement the existing housing stock, but also aids the regeneration of the surrounding area. Delivery of this scheme will also create energy efficient dwellings to bolster the Local Authorities land supply of homes.

PORT LOOP, BIRMINGHAM

Client: Midland Heart
Tenure: Affordable rent/shared ownership
Duration: 2.5 years
Location: Rotton Park Street, Ladywood, Birmingham B16 0AD
Status: Planning submitted
The proposed 87 unit development will serve as a flagship site for the Business and further cement our relationship with our Client, Midland Heart following the success of our Booths Lane development. Planning approval is imminent for the construction of 1 bed apartments along with 2, 3 and 4 bed units which will benefit from quality materials and future provisions for Electric Vehicle Charging. The proposals also include for the provision of a cycle ‘super highway’ to encourage green travel to future residents of the development.

THE FIRS, MERIDEN

Client: Stonewater
Tenure: Affordable Rent
Duration: 18 months
Status: Planning Approved
Meriden is a development that consists of 75 units comprising a mix of 1 and 2 bed apartments, along with 2 and 3 bed houses for our Client, Stonewater. The development will utilise existing redundant land and provide high quality, energy efficient housing to the region.

GREEN LANES, BILSTON

Client: Black Country Housing Group
Tenure: Affordable Rent
Duration: 12 months
Location: 141 Green Lanes, Bilston, WV14 6BZ
Status: On Site
The proposed 87 unit development will serve as a flagship site for the Business and further cement our relationship with our Client, Midland Heart following the success of our Booths Lane development. Planning approval is imminent for the construction of 1 bed apartments along with 2, 3 and 4 bed units which will benefit from quality materials and future provisions for Electric Vehicle Charging. The proposals also include for the provision of a cycle ‘super highway’ to encourage green travel to future residents of the development.

HOLYHEAD ROAD, COVENTRY

Client: Midland Heart
Tenure: Full Affordable (Mix of Rented and Shared Ownership Units)
Duration: 21 months
Status: On Site
The proposed 87-unit development will serve as a flagship site for the Business and further cement our relationship with our Client, Midland Heart following the success of our Booths Lane development. Planning has been approved for the construction of 1 bed apartments along with 2, 3 and 4 bed units which will benefit from quality materials and future provisions for Electric Vehicle Charging. The proposals also include for the provision of a cycle ‘super highway’ to encourage green travel to future residents of the development.

CANALSIDE

Client: Green Square Accord
Tenure: Affordable Housing
Duration: 12 Months
Location: Canalside Close, Walsall
Status: Complete
This scheme includes the development of existing waste ground to provide 33 affordable rented dwellings for our partner Green Square Accord, with additional funding from Homes England. The site adjacent to the Wyrley and Essington Canal and started on site in December 2022. This scheme was constructed using a modern method of construction through our client’s sister company LoCal Homes. They are providing a fully finished elevational treatment roof and structural frames.

WOODS LANE, CRADLEY

Client: Bromford
Tenure: Affordable Housing
Duration: 12 Months
Status: Complete
The scheme comprises a residential development of 36no new dwellings arranged around a shared courtyard-style space and comprising a mix of both townhouses and apartments. The design forms active frontages which establish a relationship with the adjacent train line and the existing surroundings.

BOOTHS LANE DEVELOPMENT

Client: Midland Heart
Tenure: Affordable tenures
Duration: 18 Months
Location: Booths Lane, Great Barr, Birmingham, B42 2RG
Status: Complete
Booths Lane is a development of 59 units featuring a mix of 2/3 & 4-bed homes and 1 bed apartments located on a Former Golf Course in Great Barr, Birmingham. As Keon’s first scheme with Midland heart, we are excited to develop a strong partnership and build high quality affordable homes in this developing area of North West Birmingham.

WOODSIDE WAY

Client: Bromford
Tenure: Affordable tenures
Duration: 9 Months
Location: Woodside Way, Telford, TF7 5UB
Status: Complete
This scheme includes the new build development of 21no dwellings, along with associated highways, public open space and hard and soft landscaping at the vacant land south of Newcomen Way, Woodside, Telford

CROSS STREET DEVELOPMENT

Client: Aspire Housing
Tenure: Rent
Duration: 9 months
Status: Complete
This scheme includes the demolition of existing redundant low rise flatted accommodation and construction of 9 Bungalows to accommodate the over 55’s. The works will includes some service diversions, tree surgery along with all associated infrastructure works, hard and soft landscaping and remodelling of an existing road under a S278 agreement. This is the first of 3 phases of regeneration in this area with Keon Homes kicking off this small but flagship project for our client.

STREETHAY DEVELOPMENT

Client: Walsall Housing Group (WHG)
Tenure: Affordable
Duration: 12 Months
Location: Burton Road, Streethay, Lichfield, Staffordshire
Status: Complete
Streethay is a development of 14 houses and 6 apartments located in Lichfield. The site is ideally located with various amenities, two train stations and key road networks close by. As our first scheme with WHG, Keon are excited to grow and develop a long standing partnership.

NEWCOMEN WAY

Client: Bromford
Tenure: Affordable tenures
Duration: 15 Months
Location: Newcomen Way, Woodside, Telford, TF7 5UG
Status: Complete
Our first site purchased through Homes England, located close to Ironbridge this former pasture land will be developed sympathetically to include retaining key tree lined boundaries whilst providing a generous amount of open space for its residents. Built to a high specification these two and three bedroom properties including wheelchair accessible bungalows will provide much needed affordable housing in the area.

CROSS STREET PHASE 2

Tenure: Private Rent
Duration: 15 months
Status: Planning Approved
This scheme is a secondary phase of development, following up on our successful Phase 1 delivery of 9no bungalows for our valued Client, Aspire Housing. The Phase 2 development benefits from planning approval for the construction of 35no dwellings overall consisting of a mix of 1 bed apartments, along with 2 and 3 bed properties. The delivery of the site will add provide high quality, much needed housing to the area as part of proposed larger residential scheme.

MANSFIELD BREWERY

Client: Wise Living & PGIM
Tenure: Private Rental Sector
Duration: 18 months
Status: Complete
Regeneration of the former Mansfield Brewery Site with the construction of 24 Houses and 27 Apartments (A mix of 2 and 3 bed). Works will include a new adoptable road to be constructed under a S38 agreement and all other associated infrastructure works include all hard and soft landscaping. This scheme benefits from an EPC level B rating through our clients desire to surpass the prevailing building regulations at the point of starting the site, this meant the scheme included solar panels, better windows and increased amounts of insultation.

CAMBRIDGE STREET
DEVELOPMENT

Client: Wise Living
Tenure: PRS
Duration: 15 Months
Location: Cambridge Street, Wolverhampton, WV10 0JR
Status: Complete
A development comprising of 31 small niche houses and 33 one and two bedroom apartments for our valued client Wise Living. The development has been designed to sympathetically compliment local building heritage to seamlessly blend in with the location. As a former yard, this site has lay vacant for 25 years. Our partnership with Wise Living has allowed us to offer the local planning authority a scheme that provides much needed housing whilst considering all key planning factors. Efforts from our planning consultant Harris Lamb and our Architect BM3 have been vital to getting this scheme over the line.

TILE HILL DEVELOPMENT

Client: Wise Living
Tenure: Private Rental
Duration: 12 Months
Location: Blanchfort Close, Tile Hill, Coventry, CV4 9GX
Status: Complete
Herbert House is a development of 40 1 and 2 bedroom apartments located in Tile Hill, Coventry. Due to its close proximity to local shops, schools and transport links, this location is perfect for commuters, young professionals and families. Kitted out to a high specification including fitted kitchens including a host of appliances, floor finishes, central heating and landscaped gardens, this development is a great start to our partnership with Wise Living.

RUGBY ROAD, BULKINGTON

Client: Midland Heart
Tenure: Social or Affordable Rent
Duration: 15 months
Status: Planning application submitted
This development aims to provide 42no 1 and 2 bed apartments for the over 55’s. The delivery of the project is in tandem with another of our important Clients, Midland Heart. Planning has been submitted for a minor variation to the previously approved scheme and once approved, will allow us to deliver a development that compliments the surrounding area and vastly improving the former New Inn Public House site.

WILLIAM FARR HOUSE,
SHREWSBURY

Client: The Wrekin Housing Group
Tenure: Affordable Rent
Duration: 18 months
Status: On Site
This is our second scheme working in partnership with The Wrekin Housing Group. The site was secured on the Open Market from NHS Property Services and, having worked to extremely tight Homes England funding timescales, will deliver another much-needed Extra Care scheme in Shropshire. The project will comprise of 70 apartments and 8 bungalows for Affordable Rent. Communal facilities will include a café, which will provide food and drink to residents and the wider community.

STREETHAY CARE VILLAGE

Client: Sanctuary Housing
Tenure: Affordable
Duration: 24 months
Status: On Site
Reserved Matters has been granted for the erection of an extra care scheme (C2 Use Class) comprising 78 apartments and 60 bungalows with associated communal facilities, car parking and landscaping. The site is situated towards the rear of the Roman Heights development in Streethay and will be built for our new Client Sanctuary.

STATION ROAD, NEWPORT

Client: Wrekin Housing Trust
Tenure: Affordable
Duration: 18 Months
Location: Station Road, Newport, Wrekin, TF10 7EN
Status: On Site
Working in partnership with Bloor Homes & Wrekin Housing Trust this scheme consists of an extra care facility built to our clients specification. As part of the wider Bloor Homes scheme this parcel of 1.4 acres is allocated for C2 care uses and already has an Outline planning status. We are currently working with Bloor Homes to agree our designs for our final planning application.

TARA DEVELOPMENTS OFFICE

Client: Tara Developments
Tenure: Commercial Office
Duration: 9 Months
Status: Complete
St Josephs House is a purpose built bespoke office designed and constructed to a high quality finish. The office reflects Keon Homes intentions to grow the team and the business whilst maintaining our high standards.

LONG NUKE ROAD

Client: Birmingham Municipal Housing Trust
Tenure:Affordable Rent/Open Market
Duration: 2 years
Location: Birmingham
Status: Full Planning Approved
We are delighted to announce that we have been awarded the contract to construct 65 houses on Long Nuke Road, whilst also delivering a Sports Pavilion and 6 football pitches (3 of which are to FA standards) in the nearby Senelleys Park, Birmingham on behalf of our valued client, BMHT. Full planning permission has been granted for all these works.

CRICKET CLOSE

Client: Walsall Housing Group
Tenure: Open Market/Affordable Rent
Duration: 12 months
Location: Walsall
Status: Phase 1 Planning Approved
Situated in Walsall, our Cricket Close development consists of the construction of 22 luxury homes for open market sale and 7 homes for affordable rent on behalf of Walsall Housing Group. Planning permission has already been granted with scope for a second phase dependent on planning.

WHEATON ASTON

Tenure: Open Market
Duration: 12 Months
Location: Long Street, Wheaton Aston, Staffordshire, ST 19 9NF
Status: Complete
The development of 21 units located in desirable Staffordshire village that is Wheaton Aston which is the perfect location for anyone who wants a balance between the tranquillity of village life, access to basic amenities and with excellent travel links to the road works for anyone who commutes to the midlands and beyond.

The scheme is a high quality Open market scheme (16 units) but also provides 7 affordable homes featuring a mix of 1 & 2 Bed bungalows with 2, 3 and 4 bedroom houses. This scheme will build on the previous success of Cherry Orchard and provide much needed homes at a location we feel will be extremely attractive to a wide range of potential purchasers / tenants.

WELSH ROAD EAST,
SOUTHAM

Client: Walsall Housing Group
Tenure: Affordable Rent & Shared Ownership
Duration: 12 months
Location: Welsh Road, Southam
Status: On Site
Keon Homes are delighted to announce the successful tender award of Welsh Road, Southam. Working once again with our valued client Walsall Housing Group, we will be delivering 43 units with a mix of 1, 2, 3 & 4 Bed Homes available for Shared Ownership and Social & Affordable Rent.

WINDMILL RISE

Tenure: Open Market Sale
Duration: 12 Months
Status: Complete
The proposed development is located on the former Windmill Pub site in Lichfield and will provide 12no open market units with fantastic links to the vibrant and historic city of Lichfield, local amenities and the neighbouring Beacon Park.

CHERRY ORCHARD

Tenure: Open Market Sales
Duration: 12 Months
Location: St Josephs Close, Lichfield, WS14 9AE
Status: Complete
The Orchard offers a selection of seven sumptuous new homes, set in a quiet enclave close to the city centre. Available in a choice of five delightful designs, each home is carefully constructed using a range of russet-coloured bricks with traditional tiled roofs.